Full Decommission for Heated Storage
Includes taping off the water heater breaker, draining the water system, cleaning the fresh water pump strainer, emptying the refrigerator and icemaker, checking engine and genset coolant levels, changing engine oil, filters, and fuel filters (if needed), changing genset oil, oil filter, and fuel filter (if needed), cleaning shower box drains and sea strainers, removing oil zorbs from under the engine, pumping out hull water, checking or changing lower unit lube (if needed), and turning off all switches and circuit breakers, including the flybridge electronics panel.
Full Decommission for Cold Storage
Includes everything in the Full Decommission for Heated Storage package, plus winterizing the engine(s), genset, washdown system, air conditioner, air conditioner pump(s), dockside water, dishwasher (if equipped), washing machine (if equipped), icemaker and/or refrigerator icemaker, windshield washers, and engine room water supply. Service also includes checking coolant freeze level, hauling out, shoring, spring launch, pumping out the holding tank, pressure washing the bottom*, and opening all thru-hulls.
*Unpainted bottoms may require an additional labor fee.